Site A - Boston
Last login: Just now
Open Deviations
3 -12%
Critical Issues
1 Stable
Active CAPAs
2 +2
AI Recommendations
1 3 high
| ID | Title | Severity | Status | Date |
|---|---|---|---|---|
| DEV-2023-001 | Temperature Excursion in Bioreactor 4 | Major | Investigating | 10/25/2023 |
| DEV-2023-002 | pH Drift in Buffer Preparation | Minor | Open | 10/26/2023 |
| DEV-2023-003 | Particulate Matter in Vial Inspection | Critical | Investigating | 10/24/2023 |
| DEV-2023-004 | Pressure Drop in Filtration Unit | Critical | Closed | 10/10/2023 |
| DEV-2023-005 | Labeling Error on Packaging Line 2 | Major | Closed | 9/15/2023 |
Predictive Maintenance for Cooling Valves
92% RiskAnalysis shows 85% correlation between valve age > 2 years and sticking issues. Recommend proactive replacement cycle.
Based on 3 similar deviations
Standardize Buffer Prep Mixing Speeds
65% RiskpH drift correlates with variable mixing speeds across shifts. Standardizing RPM may reduce variability.
Based on 1 similar deviations
Live Manufacturing Data
Live MonitoringTemperature
Site A - Boston
37.2 °C
Target: 37.5
Pressure
Site A - Boston
1.2 bar
Target: 1.5
pH
Site A - Boston
7.1 pH
Target: 7.4
Temperature
Site B - Austin
36.8 °C
Target: 37.5
pH
Site B - Austin
6.7 pH
Target: 6.8